Putting t.Parallel() in each test makes them run in parallel.
Additional t.Parallel() could be added to each subtest, although
that requires making a local copy of the loop variable for
table driven tests.
Test: m checkbuild
Change-Id: I5d9869ead441093f4d7c5757f2447385333a95a4
Add a -srcjar argument to soong_zip that causes it to read the
package statement of each .java file and use that to place the
source file at a path that matches the package.
Test: jar_test.go, zip_test.go
Change-Id: I36017e42445ba3b0a82a10a8d81e8ac0cca096f2