This reverts commit 323dc60712.
Reason for revert: Possible cause of test instability
Bug: 170513220
Test: soong tests
Change-Id: Iee168e9fbb4210569e6cffcc23e60d111403abb8
Putting t.Parallel() in each test makes them run in parallel.
Additional t.Parallel() could be added to each subtest, although
that requires making a local copy of the loop variable for
table driven tests.
Test: m checkbuild
Change-Id: I5d9869ead441093f4d7c5757f2447385333a95a4
The linux kernel requires that the ELF interpreter (runtime linker)
that's referenced by PT_INTERP be either an absolute path, or a relative
path from the current working directory. We'd prefer a relative path
from the binary, similarly to how we handle looking up shared libraries,
but that's not supported.
Instead, extract the load sections from the runtime linker ELF binary
and embed them into each host bionic binary, omitting the PT_INTERP
declaration. The kernel will treat it as a static binary, and we'll use
a special entry point (linker_wrapper) to fix up the arguments passed by
the kernel before jumping to the embedded linker. From the linker's
point of view, it looks like the kernel loaded the linker like normal.
Bug: 31559095
Test: Enable host bionic,
out/soong/host/linux_bionic-x86/nativetest64/libdemangle_test/libdemangle_test
Change-Id: I8d0aea9790b5e86fcc3ea6e2d00cfa33907e2853